Country: Stavropol Territory, Kochubeyevsky District , behind downstream right-bank dam slope of regulating water reservoir of HPP-4 of Kuban HPP Cascade Year of ending: August 2015 – May 2017
Design and survey works on the project «Small hydropower plant «Barsuchkovskaya»», 5,13 MW
Front-end engineering design implementation (dam site determination and facility’s preliminary parameters)